Thursday, December 23, 2010

Universal Combination Master Lock

appointment with the notary

Today, the contract for the land signed by the notary, that we still pay the old rate of land transfer tax.

How Do You Say Adults Only Reception In Spanish

up a blog

This is our first entry in our blog. We want to publish our thoughts, construction progress, etc.

Saturday, December 18, 2010

How To Play Number Munchers Online For Free

catchment:-P

yep ...! Moving into the house was already at 18.12. Unfortunately, the read for work and "we-sit-else-on-the-street"-reasons not otherwise accomplish.

to cut a long story short - yes, it's all terribly stressful, build a house within a year, just to get on the moving date completed (on a dry floor for example) and then be recovered in due time, however: it is and depends solely on the personal skills of the owners. And I'm not necessarily just the "craft" skills! ^ ^

Over the holidays we have now so the EC first inhabited between the boxes, on portable cooker pasta cooked, then extended and then us cared much about little things such as the kitchen and the further expansion of the floor.

No do not worry, pictures coming soon ...

Sunday, November 28, 2010

Club Penguin Do You Get Rainbow Puffle 2010

interior Wozi

ham's Home For we ne chic stone masonry wall (use PCI Carreflex), there is now indeed in all possible versions ... and the B & W Surrounds I've identified, it must be the in the ceiling.


... the ceiling spot even with the sheetrock make guys ... (remember:. pay attention to the spots on 80% down and only Wärmeababgabe electrical ballasts will not take the heat, wool, clearances and pay for adequate ventilation in the ceiling, is clearly not it?)

the cans are still covered when the door is set ...

B & W CCM 80

Saturday, November 27, 2010

Can You Buy Oxycodone In Costa Rica

interior bathroom

.... jahaaa, long nix geblogt more - now we ham 'us erstma' 2 week vacation "indulged" and sometimes just push the interior with lightning speed ..... everything is also fine so far!

Here's a quick situation report:

sanded floor: ready
loft ladder fitted: ready to complete
primer: ready to complete
Painting: rumpinseln ready
Lastogum: Ready
BetteFloor EC / OG: Setting finished
other sanitary objects: ready
Bad ground, upper floor tiles: ready
bathroom first floor, upper floor grouted: Bad injected ready
EC / OG Silicone: my turn ...
ceiling lights installed: done.
set range of switches: floor finish
EC Tiled: ready grouted
hallway floor: ready
brick home theater stone wall: ready
speakers installed in ceiling: ready
Projector Mount: mist, which is still missing .... I tuned ...
laid parquet: hmm ... unfortunately still screed moisture content of about 0.7% and there is no floor ma put in, then wait again and fire up the infernal machine!
build kitchen floor right after the feeding

: 17.12.? can be done. loose. bffff. :-P

bathroom first floor - tiles from bella Italia - ah uf the cover should i press nommal druff see i grad ..

jaja, silicone .... I do not like tomorrow night!

Keramag Renova No 1 of the classic

decorative flowers - Viega push plate (Viega wall elements be obstructed from FH)

Keramag icon sink, the Hansastela sticks are great - very cheap are degrees wide at Reuters badshop.de ;-)

bed floor 160 - Glass wall is yet to ... floor will be waiting ....
... the rest of the bathroom - then next comes out of the sauna, so isses Bad yes au grooooossss so, right? ;-)
Hansa Raindance E420 * harhar *

... and so it goes with Bette Floor: floor, avoiding Katja film purely mounting frame set, ran, sealing tape, sealing all schee with mud "eischmotze" ...

... on the wall schee PCI Lasotgum noschmiere and then set the bed on de Rahme - done!
left nor the Standarmaatur Steinberg Series 100 for the Baaaaadewanne (is still)


The tip: we use only out of conviction PCI Augsburg products So whether flex mortar, Lastogum, Silkoferm, Gisogrund or something .... Just had good experiences with them, even if it's more expensive. Clear recommendation!

Oh and we bought all sanitary matters over the Internet was, on Reuters-badshop.de not an issue that went really well, even with the fast delivery, we are very satisfied, especially with the prices! ;-) Frankly, we do not understand how the plumbing trade around the corner can hold at all ...

And yes, mosaics are really beautiful, but difficult to install and grouting.

Friday, November 12, 2010

Free Hindi Channels Frequency In Bahrain

filling work

From 08.11. to 12.11. our Spachtler been engaged, have 2 men in 4 days, everything leveled out sparkling clean and abraded. We want to emphasize the plasterboard directly, so no wallpaper. The house purchased by Finger Jointing Q2 reached out completely, the walls are all super smooth, one more price for Q3 Skimming is not absolute necessary. Perfect work!

Wednesday, November 3, 2010

Lessons About The Poem The Lonely Soul

Blower Door Test

Today we had our blower door test, the result is approximately about 0.9 / h, must be precisely calculated, but again, because the parameters altitude, and others. The cabin seems to be quite tight, the values are probably good, the limit would be set at 1.5 / h and 0.6 / h then would be a passive house standard. Time to wait for what the protocol will be accurate as final value spits ...

blow ...

Tuesday, November 2, 2010

How To Do Online Payment Aetna

LWZ Stiebel Eltron

All in all, we are with the LWZ 303 SOL been very pleased - The item turns up the heat the booth as the Deifel! Iim time seems to pass the floor drying program, the flow is straight at 40 ° C and the return at 36 ° C, the noise is kept within acceptable limits.

It is always here geprochen of "Refrigerator volume", a bit more but it is already, mainly starts when the compressor / evaporator. So in the utility room with open doors to the adjoining living room or bedroom (over or under it), I would not necessarily recommend, even if the device as with us on a separate floor from the anti-vibration pad. By writing a reasonably sound-insulated door, but as the kitchen adjacent as ours is not an issue.
We will assemble in a sound-insulated utility room door (with Schalldämmkern) and homemade Innenaufdämmung, there indeed of almost any door manufacturer. For more information on the insulation of doors, I recommend the relevant "Home Internet forums" - here you get a lot of interesting and living room compatible tips.



silencer on the ceiling

MSP, T-Com, water, solar, pressure vessel

the Monschder!

Friday, October 29, 2010

Cimbali Bistro Espresso

floor drying program

... .... .... and ventilate and dry and heat .... and ventilate and dry .... .... and heat ....









Monday, October 25, 2010

Flat White Discoloration On Nose

screed

.... on Friday, 22.10. The screed was introduced, the result is far from perfect!
On Thursday, we start with the floor dry LWZ program - in addition we are second from the (You can borrow in the DIY / Building Materials) use week then still a dehumidifier.
is important that the surface is sweating right in the first 5 days, not air and not heat well. After that, get out the moisture from the house, so airing several times a day, the screed drying cycle and the air dryer worried then the rest
So it is waiting to scrap again ...

how it glitters ...

Friday, October 22, 2010

Show Breasts With Kiss

house position 3 Weeks

has now installed the LWZ finished the remaining Lüftungs-/Heizungs-/Wasser-Rohre laid out by the pressure test and everything put into operation.

The floor cutouts for the giant-160x90 Bette shower tray, we also set the same, thanks to Michael, the friendly neighbor - who has also still the same help with beer supplies! ;-)

We incidentally mount only Bettefloor (OG) or Bette Super Flat (EC) mounting frames - unfortunately these are not yet delivered, the mounting frame (including recess means) can namely already assembled on the floor to stay inside, and - aba Wurscht - will work that way too. The screed can

So come on Friday ...

with the installation team, we have been absolutely great satisfaction - All great to get guys who always work hard late into the night to finish all construction sites. Thanks man! :-)


the Monschder * harhar *



snakes living room

kitchen snakes
recess small shower

recess shower

spa shower with light window * harhar *

Office snakes (including screed floor box for LAN / phone / electricity)

Badschlangen (before opening)

Tuesday, October 19, 2010

Name For Clutural Fest.

Body shop party




















I know I know ....... it's gone again weeks since my last post ... running out of time .. and at the end of the week think it was but it was Monday .... oh dear

Well so far so good. So we held on 11/09/2010 after breaking a small shell of the roof party. We invited our families, friends, work colleagues, old and new neighbors. The weather has really meant that day very well with us, the sun was shining from the sky and there are very many people came. On the whole it was a very nice and successful day.

We had the opportunity to meet some of our new neighbors and it was just great. Very nice and open people.

Very pleased I was also visiting my Great Aunt Helen. Oh, and my Dani was also there with my little mini friend Lina and Olli.

Jochen's dad gave us all with delicious sausages and steaks supplies and especially I would also like to thank you again Rebecca for their active support. Without it, some guests had been sitting on "dry land". So again to awful love you for that.

The kids are not left short and huge fun had our dug especially for the connections of the air-water heat pump pit with a lot of zeal fill them again * laughing *..... So the huge mound of earth behind the house was the No. 1 attraction, accordingly, the mudlarks saw then too.

So, my friends, I wanted to just quickly now to prepare the images of the body shop party. But I promise the next post can not be long in coming ...... it is in fact much has happened - particularly, the OWN WORK started * laughs *..... but this next time around.

Until then, all love