Hello my friends are gone now
already almost half weeks and there are quite a few changes. Due to the bad weather in recent days, we are about 1.5 weeks behind our construction schedule. With the constant rain could not the basement be sealed, thus could not be filled in the pit and thus the frame could not be made to expose the cover for the attic. But all wild half, I think it is progressing well.
You can now walk properly on the ground floor ...... I've enjoyed the beautiful view from the future living room and am curious how it looks when we are only once in the attic. At the moment, yet somehow all the rooms seem small, but our construction manager says that all the accessible * Laughs *..... when women say are the pillars of the rooms only once, and the walls are plastered, would contribute all completely different. Let us wait times from .......
Well now the pit was filled and we still have much soil around .... damn it, we can leave but already 700 tonnes. But I can through the "door" in the shell * laughs * go
On Monday or Tuesday, the framework should be built up and the afternoon will be delivered the ceiling. Then whoosh, the wupp nor the iron inside and then filled with concrete. If the ceiling is dry then you can start the masonry walls and the attic.
Jochen and I were in the meantime too hard. We have chosen the window and the door is ordered. The food is purchased and the two bathrooms are also chosen was quite tiring ..... the * laughs *.....
Let's see what next week will all happen so ...... I'll tell you then!
Greetings
Ivonne