Creating the base plate






So, the bottom plate is created. So far it's going really well and the work also look quite good so far. I think we can beschwehren not really up to us now, everything went pretty fast. I'm curious when the basement is finished ..... according to construction schedule even at the end of August .... we are waiting to be topping it off again and see if the times can be met .....

Greetings
Ivonne

Thursday, July 15, 2010

Mcdonaldes Casual Pay

site equipment






After the burrows had done its work, the site has been created. It has brought a large crane, and a lot of Materiel DIXI-loo * laugh *

Tomorrow will begin the construction company to build the base plate. But the surveyor will come again and "Calibrate" the house in the big hole. It will provide a so-called string frame. After this string structure is then created the formwork and the concrete mixer can roll in .....

I do the neighbors ...... so terribly sorry for it being on vacation and every morning to roll trucks to deliver materials or even the concrete mixer ......

I will continue report until then ...... Greetings

Ivonne

Tuesday, July 13, 2010

High Musical School Barbie

roll The excavators - now there is no way back ;-)





Now everything went pretty fast. After the building permit was present, the soil report has been created. Unfortunately, my prayers were not answered ...... there is no gold, no oil was found - just stones. The soil is rather "muddy and slate ".....

The land was mapped out for the dredging and rough on 07/08/2010 then began the dredging work. That was a strange feeling when I went on Thursday to the property. We were still there Wednesday at times to look and on Thursday a huge hole and an even bigger mountain of excavated soil was there.

On Friday, we had 07/09/2010 then the first "construction manager meeting" at our site. Here then a few more details were discussed. I find it pretty hard even with all this to picture - as I said big hole and a huge pile of earth - but it'll be all right I think. We get open a little homework. Should I go to apply for house connections (electricity, water, telecommunications) care. This is not as easy as I had imagined. It knows all the work ethic and customer-friendliness of the Telekom * *

laughing at 12.07. / 07.13.2010 was our tank and set the sewer manhole. The construction site is progressing and so far we are really pleased. Let's see if it continues. On Thursday to come, according to foreman and site manager of the crane and the end of next week is already the base plate to be ready. Let's see ..... I'll tell you then ..... Until then click

Greetings

Ivonne

Saturday, July 10, 2010

Espnstar Sports Stream

So it will look like






* For a better view simply on the picture *

Well let's see whether it eventually, will we, we have imagined. looks on paper it already very well but we wait times from what it actually looks and met our expectations fully.

I Mat Mobilece0560 Price In Pakistan

Good things take time, or rather, "What is length has to turn out well :-)"

Hello my friends,

I know, I know it's already half a year has passed since my last post but a lot has happened in the past few months and somehow there was also home-technically nothing to report. I promise that I will now always be up to date ......

There was some delay, had different reasons. Our architect has found as he prepared the plans for the planning application that we exceed the required ridge height by 1.10 m ..... there went off the stage. He suggested intend to change the roof pitch which would have cost us but for our living room and what ever was out of the question. Jochen was not amused, and so we have decided to make a small detour and to provide a Deviation Request a Projected. Okay there was only us ...... even clear that lasts and lasts and lasts ..... but it was worth it! The Projected was completed and about 6 weeks later we had the decision that would be made to pay for the planned deviation approval. We have treated or derogation regarding the tile color. namely Mandatory are brown or red brick, and I would like to have anthracite. So we have done the same in a "go". Well and as to the ridge height, which we now exceed by about 1.37 m * grin *...... namely in the basement we have a stone placed on it though because :-).... has been to Jochen thought * grin *

Well, then, the official planning application has been prepared and submitted. It was actually quite fast and after about 8 weeks was before the building permit. - Now you can start it so - let's do it to.

get your order once a rough idea of how our new home will look like, I set a time and view the floor plan.